| CATALOGUE » TUFFCRETE- MAB |
| |
| POLYMERIC MODIFIED ACRYLIC COATING FOR WATER PROOFING & REPAIRING OF STRUCTURE |
| DESCRIPTION |
 |
| |
| TUFFCRETE- MAB is an acrylic based polymer for structural repairs of concrete/mortar and waterproofing system. |
| |
| USES |
 |
| |
| This polymer modified system is effectively useful for, |
• Give additional strength to damaged R.C.C. structure.
• Repairs of concrete structures. Brick-masonry and mortar works.
• Waterproofing treatment of water tank, swimming pools etc.
• Roof slab, parapets, terraces, basement & Retaining walls.
• Against corrosions salt attack.
• Injection grouting. |
| |
| ADVANTAGES |
 |
| |
• Gives complete adhesion with old-new structures of concrete & mortar.
• Flexural & tensile strength increased with anti corrosion property.
• Reduces water-cement ratio, which results in to a impermeable concret. |
| |
| PROPERTIES |
 |
| |
| Colour |
Milky white liquid |
| PH |
8-9 |
| Sp.Gravity |
1.01 |
| Solid Content |
32 ± 0.5% |
| Shelf Life |
One year in sealed container |
| Packing |
Available in 1 kg, 5kgs & 20kg pack. |
|
| |
| DIRECTION FOR USE |
 |
| |
| The area to be coated must be clean and free from oil, Grease & other contaminates. Remove loose materials by scraping, chipping, mechanical abrasion or any other suitable method. Clean surface with water. |
- Bond Coat: Take 1 part TUFFCRETE-MAB by wt. & 1 part cement. Mix it in one vessel& apply by brush on cleaned, pre wetted surface. Allow it to dry for 1 2 hrs.
- Modified Mortar : Take 50 kg cement bag, 125 kg medium sand, 7.5 kg TUFFCRETE-MAB & water 8 to 10 kg as required. Apply this material over tacky bond coat.
- Waterproofing Slurry : Take 1 part TUFFCRETE-MAB by wt. & 2 part fresh cement with continuous mixing. Add powder in to liquid part never add liquid in to the cement. Apply this slurry on the cleaned, pre wetted surface in 2 coats at the interval of at least 3 4 hrs between each coat.
- Injection grouting : Make "V" groove in the cracks & fix up the nozzle at the interval of 0.5 to 2 m.m. along the groove. Take 1 part TUFFCRETE-MAB + 5 part cement & add water to become injectable slurry for injection as per regular practice.
|
| |
| CURING |
 |
| |
| After 24 hours of final coat, Sprinkle the water or cover wet cloth for next 3 days. Continuous wet curing or ponding is not required. |
|
| |
|